Notes:
The Portlaoise Local Area Plan 2018 – 2024 was adopted by the Elected Members on 22nd October 2018. The plan comes into effect on 19th of November 2018.
Stage 6: Adopted Local Area Plan
- J17 National Enterprise Park Masterplan Document
- J17 National Enterprise Park Masterplan Flythrough Video
- SEA Statement
- SEA Non Technical Summary
- SEA Environmental Report
- SEA ER Annex A
- Natura Impact Report
- Strategic Flood Risk Assessment
- Addendum SEA, AA & SFRA
Stage 5: Second Chief Executive’s Report
Stage 4: Material Alterations
- Portlaoise Draft Local Area Plan 2018 – 2024 Proposed Material Alterations
- Draft Togher Masterplan 2018
- Portlaoise Draft Local Area Plan 2018 – 2024 Proposed Material Alterations SEA AA SFRA
- Portlaoise Draft Local Area Plan 2018 – 2024 Proposed Material Alterations Schedule 2A Screening Assessment
Stage 3: Chief Executive’s Report
Submissions Received on Draft Plan:
Group A: Prescribed Bodies & Group B: Elected Representatives:
Group C: Individual Submissions:
Stage 2: Draft Display Public Consultation
- Portlaoise Draft Local Area Plan
- Map: Objectives Map
- Map: Land Use Zoning Map
- Map: Public Realm Map
- Map: Portlaoise Flood Plains
- Map: Architectural Conservation Area
- Map: Location of Protected Structures
- Map: Architectural Conservation Area
- Map: Archaelological Significance Zone
- Map: Housing Protection Areas
- Map: Togher Master Plan Area
- Portlaoise SEA NTS
- Portlaoise SEA ER
- Portlaoise SEA ER Annex A and B
- Portlaoise AA Screening Report
- Portlaoise Natura Impact Report
- Portlaoise SFRA
- Portlaoise Draft Plan Notice
Stage 1: Pre – Draft Informal Public Consultation