Of the use of STOP-GO BOARD(s)
At the following location: N80 Graiguecullen
Road: N80 Graiguecullen
From a point: Sleaty Road Roundabout
To a point: on Bridge over the River Barrow, 200m west of the Athy Rd Roundabout
ON and/or BETWEEN the following dates & times
22/10/2018 7pm and 25/10/2018 5am
For the purposes of – Pavement Resurfacing – 7pm to 5am – 22nd to 25th Oct
Please see map below
Any objections or observations shall be emailed to:
tmadden@laoiscoco.ie
nsweeney@laoiscoco.ie
fnasiem@laoiscoco.ie
Signed: Tadhg Madden E. Engineer Road Design
On behalf of the Roads Authority